Tribometer_plan: Earned Value Analysis

Task Planned Value Earned Value Actual Cost Cost Variance Schedule Variance Estimate at Completion Budgeted at Completion Variance at Completion CPI SPI CV % SV % TCPI
1) Logistic
1.1) Set up Slack
1.2) Set up Trello
2) Problem Framing
2.1) Revised Problem Statement
2.2) Constraints
2.3) Preliminary Objectives
2.4) Functions
2.5) Expanded Objective List
2.6) PCC Chart for top level objectives
2.7) Objective Trees
2.8) Problem Framed
3) Design Phase
3.1) Design Alternatives (with sketches)
3.1.1) Generate Design Alternative 1
3.1.2) Generate Design Alternative 2
3.1.3) Generate Design Alternative 3
3.1.4) Generate Design Alternative 4
3.2) Preliminary Morph Table
3.3) Scored Morph Table
3.4) Ranked Morph Table
3.5) Design Phase Completion
4) Design Evaluation Phase
4.1) Best of Class Chart
4.2) Prototyping for Subsystems
4.2.1) Disk Drivetrain & Control System
4.2.2) Pin Positioning System
4.2.3) Force Actuation System
4.2.4) Force detection & data logging System
4.2.5) Computer Controlled Software
4.3) Prototype tests
4.4) Mathematical Modeling
4.5) Choose the best design
4.6) Final Design Evaluation & Testing
5) Manufacturing
6) Final Prototype Finished
7) Presentation
7.1) Outline
7.2) Making Presentation
7.3) Deliver Presentation
8) Documentation
8.1) Design Documentation
8.2) Design Evaluation Documentation
8.3) Final Design Evaluation Write-up
8.4) Writing Final Tech Report
8.5) Deliver Final Tech Report
9) Deliver All Deliverables

Key

  • Planned Value - Budgeted Cost of Work Scheduled (BCWS)
  • Earned Value - budget Cost of Work Performed (BCWP)
  • CPI - Cost Performance Index
  • SPI - Schedule Performance Index
  • CV% - Cost Variance Percent
  • SV% - Schedule Variance Percent
  • TCPI - To-Complete Performance Index